English

English

Get a Quote
Products

Hot Products

Company News

How Often Do You Open the Pipeline? When Is a Line Blind Valve Worth Installing?
How Often Do You Open the Pipeline? When Is a Line Blind Valve Worth Installing?
2026-09-30

A line blind valve is worth evaluating when a pipeline is blinded several times a year, or when one conventional changeover causes hours of shutdown, lifting work or significant exposure to hazardous residue. No universal cycle count guarantees payback. A large critical line operated twice a year may justify the investment, while a small accessible line operated monthly may not.   The decision should be based on the cost and risk of each complete isolation event, not frequency alone.   There Is No Standard “Two Operations per Year” Rule   Some suppliers use one or two annual changeovers as a screening threshold. That can start a discussion, but it is not an engineering rule. Frequency has very different consequences on a DN50 utility line and a DN600 process-gas main.   For a preliminary review, the following bands are useful but not mandatory: Blinding frequency  Initial interpretation Once per major turnaround or less A removable blind or spectacle blind is often more economical. One to three times per year Compare labor, lifting, outage duration and medium risk carefully. Quarterly to monthly A quick-action line blind is normally a strong candidate. Weekly or more often Purpose-built or automated isolation deserves detailed review; also confirm that a line blind is suitable for the required cycle duty.   A low operating frequency can still support installation when every event requires scaffolding, a crane, several pipefitters or a long production interruption. Conversely, frequent operation does not justify a line blind if the process cannot accommodate its pressure, temperature, materials or maintenance needs.   Count the Complete Changeover   Traditional blinding is more than moving a plate. After the line is made safe, workers loosen bolting, spread the flange joint, handle the blind or spacer, replace gaskets, restore alignment, tighten the joint and complete leak checks. Large sizes add rigging and access equipment.   A quick-action line blind keeps the spectacle or sliding plate supported inside the installed assembly. Manufacturer literature commonly reports one-person changeover in minutes rather than the man-hours needed for conventional flange work. Those figures are useful for screening, but the project calculation should use the plant’s own procedures and recorded shutdown times.   Use a simple comparison: Annual avoided cost = operations per year x cost avoided per operation   Avoided cost may include pipefitter hours, rigging, scaffolding, gaskets and bolting, leak testing and the production value of saved time. Keep categories separate to avoid double counting. Compare the annual saving with the line blind’s additional installed price and maintenance cost.   Risk Can Matter More Than Simple Payback   Repeated flange separation creates opportunities for residual-medium exposure, damaged flange faces, poor alignment and inconsistent bolt load...

Blind Valve vs Blind Flange: Which Is Better When a Pipeline Needs to Be Opened Often?
Blind Valve vs Blind Flange: Which Is Better When a Pipeline Needs to Be Opened Often?
2026-09-30

When a pipeline must be opened and positively isolated often, a line blind valve is usually the better choice. It keeps the blind mechanism permanently installed and lets operators change between open and blocked positions without repeatedly removing a bolted end closure. A blind flange costs less and has fewer moving parts, but it is better suited to closing a pipe end that will remain closed for long periods.   This answer assumes that “blind flange” means a solid flange bolted to the end of a pipe or nozzle. A spectacle blind or a removable spade installed between two flanges is a different device, although it creates a similar solid-metal isolation barrier.   Frequent Opening Changes the Cost Calculation   The purchase price favors the blind flange. Its construction is simple, and maintenance is largely limited to checking the flange face, gasket, studs and nuts. If the closure will be disturbed only during an occasional turnaround, that simplicity is difficult to beat.   Repeated opening changes the picture. Removing a blind flange requires the line to be shut down, depressurized, drained or purged, and verified safe. The bolts must then be loosened, the flange supported and the sealing faces separated. Larger flanges may require lifting equipment. Reassembly introduces a new gasket, controlled bolt tightening and a leak test. None of these steps is unusual, but repeating them turns a low-cost component into a labor-intensive operating method.   A line blind valve also requires the line to be isolated and depressurized before changing position unless its approved design and operating procedure explicitly state otherwise. Its advantage is mechanical handling: the plate, spacer or sliding element remains captured in the body, and the mechanism separates, moves and reclamps the sealing faces. Manual gearing may suit moderate operating forces; electric, pneumatic or hydraulic actuation may be justified for large sizes or remote operation.   The Blind Valve Reduces Handling but Adds Equipment to Maintain   For frequent switching, a blind valve can shorten the task and reduce repeated handling of heavy plates, bolts and gaskets. Its open or closed position is normally visible from the external plate or position indication, which helps field verification. It also avoids repeatedly forcing connected piping apart to insert or remove a blind.   Those benefits come with additional maintenance. Guides, screws, gearboxes, hydraulic components, seals and interlocks must remain functional. Product deposits or corrosion can obstruct plate travel, while damaged sealing surfaces can prevent reliable reclamping. The installation therefore needs drainage, cleaning access and enough surrounding clearance to complete the full movement and service the mechanism.   A blind flange has no operating mechanism to seize. However, frequent removal can damage flange faces, stretch or corrode bolting, disturb pipe al...

Can You Add a Line Blind Valve to an Existing Pipeline? Space, Fit and Installation Checks
Can You Add a Line Blind Valve to an Existing Pipeline? Space, Fit and Installation Checks
2026-09-24

Yes, a line blind valve can usually be added to an existing pipeline, but the job is rarely as simple as cutting out a short section and inserting the valve. The valve must fit the existing flanges and pressure class, but that is only the first check. It also needs room to release the sealing mechanism, move the blind plate, reclamp, and remain accessible for future operation. The modified pipework must then be supported, inspected and tested before it returns to service. A valve that fits between the pipe ends but cannot complete its operating stroke is not a workable retrofit.   Start With the Full Operating Envelope   Face-to-face length tells you how much pipe must be removed. It does not tell you how much space the valve needs once it starts moving. A swing-type line blind needs a clear arc for the spectacle plate. That space may extend well beyond the valve body. Nearby pipework, cable trays, handrails, platforms, insulation and structural steel can all block the movement. A sliding design needs enough space for the plate to travel sideways or vertically. The drive mechanism, gearbox, hydraulic cylinder or actuator adds another clearance requirement. Check the manufacturer’s general arrangement drawing for: ● Face-to-face length ● Maximum body width and height ● Full plate travel or swing radius ● Handwheel, gearbox or actuator clearance ● Space needed to remove seals and internal parts ● Lifting points and rigging access ● Safe standing position for the operator   Do not measure only from the valve centerline. A gear operator may clear the adjacent pipe while the blind plate still strikes it halfway through the stroke. Orientation matters too. On vertical piping, some designs require a specific mechanism position so gravity cannot pull an unclamped component out of place. Manufacturer instructions for one cam-operated design, for example, call for the cam mechanism to be installed below the spectacle plate on a vertical line.    Check the Existing Pipeline Before Choosing the Valve   Old drawings are useful, but the final fit should be based on field measurements. Existing pipelines may have been repaired, rerouted or pulled out of alignment since the original drawings were issued. Record the actual: ● Pipe outside diameter and schedule ● Flange standard, size, class and facing ● Distance between flange faces or proposed cut points ● Pipe centerline and flange orientation ● Available movement in the existing line ● Insulation and heat-tracing thickness ● Nearby supports, guides and expansion joints ● Operating and design pressure and temperature ● Medium, corrosion allowance and material specification   Flanges that appear similar may use different drilling, facing or dimensions. Confirm the complete flange designation rather than relying on nominal size and pressure class alone. The selected gasket must also suit the flange facing, medium, temperature and surface finish. Installing a new valve betw...

Trunnion Mounted Ball Valve
加载中...

Trunnion Mounted DN300 PN63 DBB Ball Valve

  • Payment:

    30% T/T When Order, 70% T/T Before Shipment
  • Product Origin:

    China
  • Lead Time:

    30~60 days Ex Works after order confirmation
  • Material:

    LF2
  • Method of Operation:

    gearbox
Inquiry now
Product Detail

Trunnion mounted ball valve DN300 PN63 full bore Double Block and Bleed PMSS seal(metal seal+soft seal)blowout proof stem gearbox operation with LF2 body, LF2+ENP ball/seat and 410 stem.


Quick Detail

Type

Ball Valve

Size

DN300

Design Pressure

PN63

Construction

DBB,Trunnion mounted ball valve

ConnectionType

Flange

OperationType

Gearbox Operated

Body Material

LF2

Ball Material

LF2+ENP

Stem Material

410

Seat Material

LF2 +ENP

Design Code

API 6D

Face to Face Dimension

API 6D

End Connection

ASME B16.5

Pressure & Temp

ASME B16.34

Medium

Water, Oil and Gas

Origin

China

LF2 DBB Trunnion mounted ball valve

LF2 gearbox ball valve

Blowout proof stem ball valve

Blowout proof stem ball valve

Leave A Message

If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

Related Products
Trunnion Type Ball Valve Flanged Gearbox
Forged Steel Trunnion Mounted Ball Valve 12 Inch 600LB

The 12 inch 600LB trunnion mounted ball valve has gearbox, RTJ flange, fire safe design per API 607. The 3 piece ball valve is designed per API 6D. Design Feature & Benefit 1.Small flow resistance means less pressure drop 2.Simple valve structure and light weight 3.Diversified sealing material available, from metal material TCC, satellite, stainless steel to soft material PTFE, Teflon, Nylon, Peek and etc 4.Good performance of both metallic sealing and soft sealing 5.Convenient and swift operation of the valve 6.Easy to maintain due to renewable seat ring 7.When fully opened or closed, the valve sealing face is isolated from medium corrosion.   8.Wide range of application in terms of size and pressure rating Quick Detail  Type Ball Valve Size 12" Pressure Class 600 Construction Trunnion Mounted Ball, Three-Piece Type, Side Entry Connection RF Flange Operation Gear Operated Body Material ASTM A105 Design & Manufacture API 6D Pressure & Temp ASME B16.34 Face to Face ASME B16.10 End Connection ASME B16.5 Test & Inspection Code API 598 Fire Safe API 607 Temperature Range -29℃~+200℃ Medium Water, Oil and Gas Origin China Material Specification No Part Name  Carbon steel to ASTM  Stainless Steel to ASTM WCB  LCB CF8 CF8M CF3 CF3M 1 Underplate WCB  LCB CF8 CF8M CF3 CF3M 2 Underplate Bolt A193 B7 A320 L7 A193 B8 3 Trunnion A182 F6 A182 F6 A182 F304 A182 F316 A182 F304L A182 F316L 4 Body  A216 WCB A352 LCB A351 CF8 A351 CF8M A351 CF3 A351 CF3M 5 Bonnet Nut A194 2H A194 4 A194 8 6 Bonnet Bolt A193 B7 A320 L7 A193 B8 7 Cap A216 WCB A352 LCB A351 CF8 A351 CF8M A351 CF3 A351 CF3M 8 Gasket SS Spiral Wound/graphite or SS Spiral Wound/PTFE 9 Shaft Sleeve SS/graphite 10 Seat Ring RPTFE or POM 11 Ball A105/Ep.Cr or F6 A182 F6 A351 CF8 A351 CF8M A351 CF3 A351 CF3M 12 Seat A105/Ep.Cr or F6 A182 F6 A182 F304 A182 F316 A182 F304L A182 F316L 13 Spring 17-17PH(inconel for NACE)Ni-cr Alloy 14 O-Ring Viton 15 Stem A182 F6 A182 F6 A182 F304 A182 F316 A182 F304L A182 F316L 16 Sealing Cover A182 F6 A182 F6 A182 F304 A182 F316 A182 F304L A182 F316L 17 O-Ring Viton 18 Gear Actuator   The material is according to ASTM standard Related Knowledge What is difference between floating and trunnion ball valve? The ball part of floating ball valve is movable. Under the pressure of medium, the ball has a certain displacement and presses on the sealing surface of outlet end to ensure its tight sealing. The floating structure is suitable for ball valve with small size and low & medium pressure rating. The ball part of trunnion mounted ball valve is fixed. Under the medium pressure, the floating seat will move towards the ball to ensure the sealing. The trunnion mounted ball valve is often with larger size and higher pressure.

API 6D Trunnion Mounted Ball Valve
Cast Steel Trunnion Ball Valve 24 Inch 300LB API 6D

The Class 300 flanged ball valve has cast steel WCB body, stainless steel ball, stem, seat ring along with Devlon seat insert. We also supply more types of trunnion mounted ball valve, accept customized. Design Feature 1.Firesafe design as per API 607 2.With sealant injection for self lubricating 3.With antistatic design 4.With anti-blowout stem 5.With vent and drain port 6.Full bore design 7.Three-piece type and trunnion ball 8.Gear operated for easy operation Quick Detail Type Ball Valve Size 24" Pressure ANSI 300 Construction Trunnion Type Ball, 3-Piece Body, Side Entry, Full Bore Connection Flange Connection Operation Gearbox Operation Body Material ASTM A216 WCB Design Code API 6D Pressure & Temp Code ASME B16.34 Face to Face ASME B16.10 End Connection ASME B16.5 Test & Inspection Code API 598, API 6D Fire Safe API 607 Temperature Range -29℃~+200℃ Medium WOG Origin China Dimension CLASS 300 DN mm 50 65 80 100 150 200 250 300 350 400 450 500 600 700 NPS in 2 2.5 3 4 6 8 10 12 14 16 18 20 24 28 L (RF) mm 216 241 283 305 403 502 568 648 762 838 914 991 1143 1346 in 8.5 9.5 11.13 12 15.88 19.75 22.38 25.5 30 33 36 39 45 53 L1 (BW) mm 216 241 283 305 457 521 559 635 762 838 914 991 1143 1346 in 8.5 9.5 11.13 12 18 20.5 22 25 30 33 36 39 45 53 L2 (RTJ) mm 232 257 298 321 419 518 584 664 778 854 930 1010 1165 1372 in 9.13 10.13 11.75 12.63 16.5 20.38 23 26.13 30.63 33.63 36.63 39.75 45.89 54 H mm 153 165 195 213 272 342 495 580 625 720 790 840 1050 1150 in 6.02 6.5 7.68 8.39 10.7 13.5 19.5 22.85 24.6 28.35 31 33.1 41.34 45.3 Do(W) mm 400 400 600 850 1100 1500 *350 *350 *600 *600 *800 *800 *800 *800 in 15.74 15.74 23.62 33.46 43.3 59 13.8 13.8 23.6 23.6 31.5 31.5 31.5 31.5 RF(Kg)   18 27 47 80 118 200 365 530 740 1030 1320 1540 2600 3900 BW(Kg)   14 2 38 65 105 185 342 503 713 1000 1285 1498 2540 3825 *Worm Gear or Electric Actuator Operated Dervos Quality Checking System In Dervos, we control quality throughout the whole manufacturing process. Casting inspection: Though casting inspection, we can find out the problem of raw material, such as shoddy casting, unqualified wall thickness, chemical composition and so on, which ensure that you will not be cheated.   Machining Inspection: On the one hand, we could ensure machining accuracy through this process. On the other hand, we can find out machining mistake as early as possible, to win more time for repairing and remaking  Final Inspection:  Final inspection activities include document and QC record review, visual examination, dimension check, pressure test, painting and packing check. You don’t need to come and inspect in person and all the documents could be provided as proof.

Trunnion Mounted Ball Valve
API 6D Trunnion Ball Valve 8 Inch Class 300 WCB Gearbox

API 6D ball valve is designed with trunnion mounted ball and full bore structure. The flanged ball valve has 300LB design pressure and 8 inch nominal size with gearbox operation mode, conforming to NACE MR0175 requirement. Quick Detail Type Ball Valve Size 8” Pressure 300LB Construction Two-Piece Body, Full Bore, Trunnion Ball Connection RF Flange Operation Mode Gearbox Body Material A216 WCB Trim Material Ball/Stem F6a, Seat RPTFE Design & Manufacture API 6D Pressure & Temp Code ASME B16.34 End to End ASME B16.10 End Connection ASME B16.5 Inspection API 6D, API 598 Temperature Range -29℃~+200℃ Medium Oil, Water, Gas Dervos Packing Painting Test & Report Pressure Testing & Dimension Checking

Forged Steel 3 Piece Trunnion mounted Ball Valve 600 LB API6D
Forged Steel 3 Piece Trunnion mounted Ball Valve 600 LB API6D

The API 6D ball valve is designed with trunnion mounted ball and full bore structure. The flanged ball valve has 600LB design pressure and 10 inch nominal size with gearbox operation mode, conforming to NACE MR0175 requirement.

3 piece ball valve gear operator A105 4 inch 150LB
3 piece ball valve gear operator A105 4 inch 150LB

The 4 inch 150LB ball valve is a 3-piece one with reduced port, A105 body, F6A stem, ball and seat. The The valve is made as per API6D and is tested under API 598.

V-port ball valves
150LB V ball valve Duplex Stainless Steel 4A

The 150LB ball valve, made of Duplex stainless steel 4A, has a special V port ball. The valve is particularly suitable for media containing fibers, tiny solid particles, slurry and so on. 

trunnion mounted ball valve
3 Piece Position Type Ball Valve, ASTM A105N, Class 800, 1 Inch

China Carbon Steel Ball Valve Provider Offers 3 Piece Position Type Ball Valve, ASTM A105N, Class 800, 1 Inch, Free Floating Ball, API 608, BS 5351.

Ball Valve
Forged Trunnion Mounted Ball Valve DN150 PN16 Full Bore ISO17292

DN150 PN16 Ball Valve is made according to ISO 17292 standard. The fire resistance test meets the requirements of API 607 standard. The valve body is made of ASTM A105. Its operation mode is turbine operation. The trunnion mounted ball valve with a structural length of 400mm has the structural characteristics of full bore.

Ball Valve
8" 2500LB Trunnion Mounted Ball Valve API 6D RTJ F51

8" 2500LB ball valve is made according to API 6D standard. The valve body is made of F51. It has the structural characteristics of trunnion mounted ball, full bore. It also has the design of anti-fire, anti-static and anti-flying valve stem. In addition, it also meets NACE MR0175 requirements.

Ball Valve
API6D 2" 1500LB Forged Steel Trunnion Mounted Ball Valve RTJ

2" 1500LB ball valve is made according to API 6D standard. It also complies with the design standard of NACE MR0175. The valve body is made of ASTM-A105. It has the structural characteristics of full flow and trunnion mounted ball. It has RTJ connection mode and gearbox operation mode.

Ball Valve
2" CL150 V-Ball Valve Trunnion Mounted Valve API608 RF

2" CL150 V-ball valve is made according to API 608 standard. The valve body is made of ASTM A995 4A. It has the structural characteristics of V type. It has RF connection mode, and its operation mode is polished rod torque.

Leave a message

    If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

Home

Products

about

contact