English

English

Get a Quote
Products

Hot Products

Company News

How Often Do You Open the Pipeline? When Is a Line Blind Valve Worth Installing?
How Often Do You Open the Pipeline? When Is a Line Blind Valve Worth Installing?
2026-09-30

A line blind valve is worth evaluating when a pipeline is blinded several times a year, or when one conventional changeover causes hours of shutdown, lifting work or significant exposure to hazardous residue. No universal cycle count guarantees payback. A large critical line operated twice a year may justify the investment, while a small accessible line operated monthly may not.   The decision should be based on the cost and risk of each complete isolation event, not frequency alone.   There Is No Standard “Two Operations per Year” Rule   Some suppliers use one or two annual changeovers as a screening threshold. That can start a discussion, but it is not an engineering rule. Frequency has very different consequences on a DN50 utility line and a DN600 process-gas main.   For a preliminary review, the following bands are useful but not mandatory: Blinding frequency  Initial interpretation Once per major turnaround or less A removable blind or spectacle blind is often more economical. One to three times per year Compare labor, lifting, outage duration and medium risk carefully. Quarterly to monthly A quick-action line blind is normally a strong candidate. Weekly or more often Purpose-built or automated isolation deserves detailed review; also confirm that a line blind is suitable for the required cycle duty.   A low operating frequency can still support installation when every event requires scaffolding, a crane, several pipefitters or a long production interruption. Conversely, frequent operation does not justify a line blind if the process cannot accommodate its pressure, temperature, materials or maintenance needs.   Count the Complete Changeover   Traditional blinding is more than moving a plate. After the line is made safe, workers loosen bolting, spread the flange joint, handle the blind or spacer, replace gaskets, restore alignment, tighten the joint and complete leak checks. Large sizes add rigging and access equipment.   A quick-action line blind keeps the spectacle or sliding plate supported inside the installed assembly. Manufacturer literature commonly reports one-person changeover in minutes rather than the man-hours needed for conventional flange work. Those figures are useful for screening, but the project calculation should use the plant’s own procedures and recorded shutdown times.   Use a simple comparison: Annual avoided cost = operations per year x cost avoided per operation   Avoided cost may include pipefitter hours, rigging, scaffolding, gaskets and bolting, leak testing and the production value of saved time. Keep categories separate to avoid double counting. Compare the annual saving with the line blind’s additional installed price and maintenance cost.   Risk Can Matter More Than Simple Payback   Repeated flange separation creates opportunities for residual-medium exposure, damaged flange faces, poor alignment and inconsistent bolt load...

Blind Valve vs Blind Flange: Which Is Better When a Pipeline Needs to Be Opened Often?
Blind Valve vs Blind Flange: Which Is Better When a Pipeline Needs to Be Opened Often?
2026-09-30

When a pipeline must be opened and positively isolated often, a line blind valve is usually the better choice. It keeps the blind mechanism permanently installed and lets operators change between open and blocked positions without repeatedly removing a bolted end closure. A blind flange costs less and has fewer moving parts, but it is better suited to closing a pipe end that will remain closed for long periods.   This answer assumes that “blind flange” means a solid flange bolted to the end of a pipe or nozzle. A spectacle blind or a removable spade installed between two flanges is a different device, although it creates a similar solid-metal isolation barrier.   Frequent Opening Changes the Cost Calculation   The purchase price favors the blind flange. Its construction is simple, and maintenance is largely limited to checking the flange face, gasket, studs and nuts. If the closure will be disturbed only during an occasional turnaround, that simplicity is difficult to beat.   Repeated opening changes the picture. Removing a blind flange requires the line to be shut down, depressurized, drained or purged, and verified safe. The bolts must then be loosened, the flange supported and the sealing faces separated. Larger flanges may require lifting equipment. Reassembly introduces a new gasket, controlled bolt tightening and a leak test. None of these steps is unusual, but repeating them turns a low-cost component into a labor-intensive operating method.   A line blind valve also requires the line to be isolated and depressurized before changing position unless its approved design and operating procedure explicitly state otherwise. Its advantage is mechanical handling: the plate, spacer or sliding element remains captured in the body, and the mechanism separates, moves and reclamps the sealing faces. Manual gearing may suit moderate operating forces; electric, pneumatic or hydraulic actuation may be justified for large sizes or remote operation.   The Blind Valve Reduces Handling but Adds Equipment to Maintain   For frequent switching, a blind valve can shorten the task and reduce repeated handling of heavy plates, bolts and gaskets. Its open or closed position is normally visible from the external plate or position indication, which helps field verification. It also avoids repeatedly forcing connected piping apart to insert or remove a blind.   Those benefits come with additional maintenance. Guides, screws, gearboxes, hydraulic components, seals and interlocks must remain functional. Product deposits or corrosion can obstruct plate travel, while damaged sealing surfaces can prevent reliable reclamping. The installation therefore needs drainage, cleaning access and enough surrounding clearance to complete the full movement and service the mechanism.   A blind flange has no operating mechanism to seize. However, frequent removal can damage flange faces, stretch or corrode bolting, disturb pipe al...

Can You Add a Line Blind Valve to an Existing Pipeline? Space, Fit and Installation Checks
Can You Add a Line Blind Valve to an Existing Pipeline? Space, Fit and Installation Checks
2026-09-24

Yes, a line blind valve can usually be added to an existing pipeline, but the job is rarely as simple as cutting out a short section and inserting the valve. The valve must fit the existing flanges and pressure class, but that is only the first check. It also needs room to release the sealing mechanism, move the blind plate, reclamp, and remain accessible for future operation. The modified pipework must then be supported, inspected and tested before it returns to service. A valve that fits between the pipe ends but cannot complete its operating stroke is not a workable retrofit.   Start With the Full Operating Envelope   Face-to-face length tells you how much pipe must be removed. It does not tell you how much space the valve needs once it starts moving. A swing-type line blind needs a clear arc for the spectacle plate. That space may extend well beyond the valve body. Nearby pipework, cable trays, handrails, platforms, insulation and structural steel can all block the movement. A sliding design needs enough space for the plate to travel sideways or vertically. The drive mechanism, gearbox, hydraulic cylinder or actuator adds another clearance requirement. Check the manufacturer’s general arrangement drawing for: ● Face-to-face length ● Maximum body width and height ● Full plate travel or swing radius ● Handwheel, gearbox or actuator clearance ● Space needed to remove seals and internal parts ● Lifting points and rigging access ● Safe standing position for the operator   Do not measure only from the valve centerline. A gear operator may clear the adjacent pipe while the blind plate still strikes it halfway through the stroke. Orientation matters too. On vertical piping, some designs require a specific mechanism position so gravity cannot pull an unclamped component out of place. Manufacturer instructions for one cam-operated design, for example, call for the cam mechanism to be installed below the spectacle plate on a vertical line.    Check the Existing Pipeline Before Choosing the Valve   Old drawings are useful, but the final fit should be based on field measurements. Existing pipelines may have been repaired, rerouted or pulled out of alignment since the original drawings were issued. Record the actual: ● Pipe outside diameter and schedule ● Flange standard, size, class and facing ● Distance between flange faces or proposed cut points ● Pipe centerline and flange orientation ● Available movement in the existing line ● Insulation and heat-tracing thickness ● Nearby supports, guides and expansion joints ● Operating and design pressure and temperature ● Medium, corrosion allowance and material specification   Flanges that appear similar may use different drilling, facing or dimensions. Confirm the complete flange designation rather than relying on nominal size and pressure class alone. The selected gasket must also suit the flange facing, medium, temperature and surface finish. Installing a new valve betw...

Dual Plate Check Valve DN350 PN16 WCB API 594
加载中...

Dual Plate Check Valve DN350 PN16 WCB API 594

  • Payment:

    30% when order confirmed, 70% before shipment
  • Product Origin:

    china
  • Color:

    Customization
  • Shipping Port:

    Shanghai, China
  • Lead Time:

    30~60 days Ex Works after order confirmation
  • Material:

    A216 WCB
  • Method of Operation:

    hand wheel
Inquiry now
Product Detail

DN350 PN16 Dual Plate Check Valve is made according to API 594 standard. The valve body is made of A216 WCB. It has the structural characteristics of Dual plate. Its connection mode is Wafer type.

 

Product Parameters

 

Type

Dual Plate Check Valve

Size

DN350

Pressure

PN16

Connection

Wafer type

Body Material

A216 WCB

Design Norm

API 594

Face to Face

EN558 Series 50

Flange ends

En 1092-1

Test & Inspection Code

EN12266

Temperature

-29 ~ 425°C

Applicable Medium

Water, Oil and Gas

Features

1.Dual plate design provides compact installation and rapid response to prevent reverse flow.

2.WCB body construction complies with API 594 requirements for industrial pipeline service.

Technical Drawing

Dual Plate Check Valve

Dimension Checking

Dual Plate Check Valve

Pressure Testing

Dual Plate Check Valve

Painting

Dual Plate Check Valve

Nameplate & Packing

Dual Plate Check Valve

Inspection Report

Dual Plate Check Valve

Leave A Message

If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

Related Products
Dual Disc Lug Check Valve 150 LB
Duplex SS Check Valve Lug Type Dual Plate 8 Inch Class 150

The 8 inch 150 LB dual disc non return check valve, designed per API 594, has dual plate and lug connection. The retainerless dual  plate check valve is made of duplex stainless steel 4A as its body and trim material. Quick Detail Type Check Valve Size 8'' DesignPressure Class 150 Construction Dual Plate Type, Retainerless Connection Lug Type Design & Manufacture API 594 End to End ASME B16.10 Connection ASME B16.5 Pressure & Temp ASME B16.34 Test & Inspection API 598 Body Material Duplex Stainless Steel 4A Trim Material Duplex Stainless Steel Media W.O.G. Design Feature 1.Shor face to face dimension 2.Small in size with light weight 3.Swift close of disc with small water hammer 4.Vertically or horizontally installed 5.Smooth flow passway with small flow resistance 6.Long cycle life and high reliability

6 Inch Dual Check Valve
Wafer Check Valve AL Bronze C95800 Dual Disc 6 Inch

The dual disc wafer check valve is designed as per API 594 and tested per API 598. The bronze non return valve is applicable for sea water. Quick Detail Type Check Valve Size 6'' DesignPressure Class 150 Construction Dual Plate Type, With Retainer Connection Wafer Type Design & Manufacture API 594 End to End ASME B16.10 Connection ASME B16.5 Pressure & Temp ASME B16.34 Test & Inspection API 598 Body Material Aluminum Bronze C95800 Trim Material Aluminum Bronze C95800 Media W.O.G. Dervos Inspection after Valve Assembly Valve quality is one of perspectives we care about most. In Dervos, quality control starts from raw material, machining, assembly to pre-shipment inspection. After assembly, the quality checking team will do visual checking, dimension checking, hydraulic testing and air testing. Every order must pass the test per inspection standards. Otherwise our quality checking team will not release the shipment. Inspection Reports Documents can be used to prove how we control valve quality. Along with every order, Dervos will provide clients with an inspection report & a 3.1 mill test report for free. In Dervos inspection report, you will see the actual results of dimension checking and pressure testing along with painting and packing picture. All these info are shown through data and clear pictures.   In 3.1 mill test report, we will show you the chemical composition, mechanical property and heat number for valve body, bonnet, stem, disc and so on.  

Double Disc Check Valve
Double Disc Check Valve DN3202 PN25 DN100 CF8

The double- disc check valve, made of CF8 stainless steel, has excellent resistance to corrosion. Designed in accordance with DIN 3202, the check valve is about to connect to pipes with WAFER. Quick Detail Type Check Valve Nominal Diameter DN100 NominalPressure PN25 Construction Double disc/ Dual Plate Connection Wafer Type Design & Manufacture DIN 3202 End to End  DIN 3202 Flange End Dimension DIN 2401 Test & Inspection  API 598 Temperature Range -29℃~+425℃ Body Material A351 CF8 Wedge Material A351 CF8 Media W.O.G. Dervos Packaging Good packing means good first impression. Just imagine how do you feel differently when seeing two boxes below? And you will know the reason why in Dervos we value packaging so much. In Dervos, we make sure- 1. Every valve isclean and dry. What do we do? -Clean the valve before packing -Add anti-rust oil -Add flange cover 2. No damageto valves in delivery. How do we achieve this? -Fix the valve with iron wire -Separate the valve with soft material -Layer the valve with plywood 3. Strong box and clear shipping mark

Retainerless Wafer Lug type Check Valve 6'' 900LB
Retainerless Wafer Lug type Check Valve 6'' 900LB

The 6 inch Wafer check valve is made in strict accordance to API 594. The body material LCC make sure the lug type valve is capable to handle harsh environment, and the INCONEL-X 750 spring promise the valve a long service life.

Dual Plate Wafer Check Valve API 594 DN250 10K
Dual Plate Wafer Check Valve API 594 DN250 10K

The double-disc check valve, made of A395 D1, has excellent resistance to corrosion. Designed in accordance with API594, the check valve is connected to pipes with WAFER. This valve is eligible to be put in marine working conditions.

API594 Dual-Plate WAFER Check Valve WCB 300LB
API594 Dual-Plate WAFER Check Valve WCB 300LB

The 10 inch Dual-Plate WAFER Check Valve is made of WCB and is eligible to be put under pressure up to 30LB. All Dervos check valves are tested to API 598 and must meet or exceed all applicable API, ANSI and ASTM Standards.

DIN Single Plate WAFER Check Valve DN80 PN40
DIN Single Plate WAFER Check Valve DN80 PN40

The single-disc check valve, made of CF8, has excellent resistance to corrosion. Designed in accordance with API594, the valve is of a WAFER type.

Check Valve
Single Disc Wafer Check Valve 6 Inch 150LB

The 6 inch 150 LB single disc wafer check valve, designed per API 594, has one disc and wafer connection. It will have the best performance under -29 to 350 Celsius degree.

Wafer Check Valve
3" 150LB Dual Plate Wafer Check Valve API594 A995 5A

3" 150LB wafer check valve is made according to API594 standard. The valve body is made of A995 5A. It has the structural characteristics of built-in type and dual plate. Its connection mode is wafer type.

Wafer Check Valve
CF8M 20" 150LB Dual Plate Wafer Check Valve API594

20" 150LB wafer check valve is made according to API594 standard. The valve body is made of A351 CF8M. It has dual plate and built-in type structural features. Its connection mode is Wafer RF.

Wafer Check Valve
20" 300LB Dual Plate Wafer Check Valve WCB API 594

20" 300LB wafer check valve is made according to API 594 standard. The valve body is made of WCB. It has the structural characteristics of double plate and built-in type. Its connection mode is wafer type.

Leave a message

    If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

Home

Products

about

contact